Moss Landing, CA
Four BESS systems, five BESS fires (including two residual-energy fires), no full Environmental Impact Report, metals deposition, and symptoms reported by 83% of 1,539 survey respondents
Moss 300 — January 16, 2025 catastrophic BESS fire plus reignitions on February 18, 2025 and September 18, 2026.
Moss 300 is an indoor NMC BESS and is part of Phase one of four phases. It went live in December 2020 and had its first overheating event on September 4, 2021, which led to it being offline until significant suppression upgrades could be installed and then came back online July 12 2022. At that time, Vistra invited county leaders for tours and catered meals for the celebration and told County leadershp the improved system would prevent another fire. There were two additional BESS fires at the Moss Landing complex (February 2022 and September 2022) before the catastrophic Moss 300 fire which started on January 16, 2025. Remaining batteries in the burned-out Moss 300 BESS reignited on February 18, 2025 and on September 18, 2026 after substantial de-energization.
SJSU sampling found elevated nickel, manganese, and cobalt in Elkhorn Slough soils. Dr. Ivano Aiello, a marine geologist and Chair of the Department of Geological Oceanography at San José State University’s Moss Landing Marine Laboratories, estimated roughly 55,000 pounds of battery metals fell within about a mile of the plant, about 2% of the estimated total release of roughly 2.2 to 3 million pounds of lithium-battery heavy metals. Trained community volunteers collected 124 surface wipe samples out to 46 miles; Hunterbrook analysis of that data showed nickel and cobalt within 20 miles averaging roughly 34 times higher than farther samples, with detections reported beyond 30 miles.
Monterey County listed PFAS testing in a March letter. Vistra’s finalized community testing plan, which the County approved in April, dropped the requirement. The Central Coast Water Board rejected Vistra’s work plan that excluded PFAS as incomplete and inadequate and ordered the company to resubmit a plan matching the Board’s investigative order. A Monterey and Santa Cruz Counties community survey found that 1,275 of 1,539 respondents (83%) reported at least one symptom.
McMicken, AZWarwick, NYLa Verne, CA
Deflagration, incomplete meter suites, multi-day evacuations
On April 19, 2019 at APS McMicken, IDLH levels of toxic smoke and gases (including HCN and CO) surrounding the BESS prevented HAZMAT from approaching and entering the BESS for 2 hours and 13–14 minutes after firefighters arrived (4 hours after thermal runaway started releasing the chemical mixture and caused the smoke-detector alarm to go off and the discharge of Novec 1230). Opening the door was followed by a deflagration that seriously injured firefighters.
Warwick’s published 2023 real-time suite was O2, CO, H2S, LEL, VOC, and HCN. Reporters and interviewees described the smoke as overwhelming, with a metallic taste and burning eyes, throat, and lungs as far out as half a mile away during a live broadcast. The same limited suite was used for all three Warwick fires, missing the majority of the known lithium-BESS fire analytes.
La Verne’s Weymouth plant fire in September 2026 forced police to go door-to-door to 504 homes to ensure everyone was evacuated. Evacuations lasted three days. LA County Fire Health Hazmat reported low levels of gases typical of battery fires (they confirmed testing for hydrofluoric acid, hydrogen, and carbon monoxide) immediately around the BESS units, but declared non-detect beyond the perimeter. Residents reported total fish kill in koi ponds and exposure symptoms for people and pets. The fire jumped to an adjacent BESS unit and forced continuous water cooling (reports of roughly 1,500–1,800 gallons per minute at times). Separate runoff samples from the water used to cool the batteries were collected by MWD, the City of La Verne, and Los Angeles County Public Works and sent for laboratory analysis.
East Hampton, NY
PFAS in wells after a small cell count burned
On 31 May 2023 a thermal-runaway fire at the 5 MW East Hampton Energy Storage Center (NextEra) required continuous water application for 30 hours(more than one million gallons reported by NYDEC) and roughly 4,900 pounds of Novec 1230. Four months after the BESS fire, NYDEC's 12 inch deep soil sampling (a common industry dilution tactic) for battery-related metals found none above standards- but didn't test for lithium as the lab the BESS owner chose was "not certified for that analyte in New York"; additionally, NYDEC DEC did not add lithium to the required metals list until the day after the samples were collected on October 4th 2023. The groundwater was not sampled. After 4 BESS fires suring the Summer of 2023, Governor Hochul rapidly assembled Inter-Agency Fire Safety Working Group (which is made up of BESS developers, industry consultants, and a few government agencies) released thier December 2023 initial findings which stated there were “no reported injuries and no harmful levels of toxins detected,” based on those results the industry, BESS owner, and working group published the narrative the wanted, but didn't disclose any detail of what was tested nor the actual results- just the summary that fit their goals. And, based on those published results, NextEra and National Grid immediately stated it was “apparent that there are no adverse impacts to the soils as a result of the BESS fire discharge water” and “recommend no further investigation or remedial activities.” They requested that the state change the spill status to “closed.” In early 2026 Suffolk County Water Authority developed its own method for ultra-short-chain PFAS and detected PFPrA in four Bridgehampton Road public-supply wells. The county wells were about 2500ft downgradient from the burned BESS and those wells represent about 1/3rd of Sulfolk County's water supply and were taken offline becuase lab results showed they exceeded New York’s 50 ppb unspecified-organic-contaminant standard and several private wells have also been taken offline due to contamination- and one two more Sulfolk wells are restricted to emergency use only. SCWA filed a federal lawsuit in May 2026 against NextEra, LG Chem, and LG Energy Solution based on the contamination findings. NYDEC’s September 2026 preliminary report later confirmed the PFPrA source as Novec 1230 mixed with firefighting water (soil near the building reached 600 ppb; groundwater immediately adjacent reached 10,000 ppb- both above NY's 50 ppb limit). The agency noted that the absence of battery-metal detections in 2023 soil samples was the reason groundwater had not been tested at the time. Tap water currently meets standards only because the affected wells have been taken offline or restricted to "emergency" use only; the contamination remains in the groundwater. The federal lawsuit is still pending and the toxic aquifer plume is still moving.